12月英語(yǔ)六級(jí)閱讀理解模擬題

時(shí)間:2021-01-15 13:51:02 英語(yǔ)六級(jí) 我要投稿

2015年12月英語(yǔ)六級(jí)閱讀理解模擬題

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (標(biāo)準(zhǔn)件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

2015年12月英語(yǔ)六級(jí)閱讀理解模擬題

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  參考答案: 1. A 2. C 3. B 4. D 5. A

【12月英語(yǔ)六級(jí)閱讀理解模擬題】相關(guān)文章:

大學(xué)英語(yǔ)六級(jí)閱讀理解模擬題07-22

2016年6月英語(yǔ)六級(jí)閱讀理解模擬題02-10

2016英語(yǔ)六級(jí)考試閱讀理解模擬題及答案03-02

小升初語(yǔ)文閱讀理解模擬題09-16

2015年大學(xué)英語(yǔ)六級(jí)閱讀理解模擬題07-08

2016年英語(yǔ)六級(jí)閱讀理解強(qiáng)化模擬題及答案03-01

2016考研英語(yǔ)閱讀理解模擬題07-04

2016高考英語(yǔ)閱讀理解模擬題06-08

考研英語(yǔ)閱讀理解模擬題—哲學(xué)01-28